Photo background
1 / 3

4-Bedroom House in Kiyosakicho

Kiyosakicho, Hikone, Shiga•滋賀県彦根市後三条町字宮立114番43(地番)

Price

$157,439

Layout & Size

4 rooms / LDK / 1,050.6 ft²
Listed
7/16/2026
Property Type
House
Price/Size
$149.9
Gross Yield
estimating
Last Updated: July 30, 2026

Features & Amenities

System Kitchen
Bathroom Dryer
Roof Balcony

property.other_features

City Gas
Electricity
Water Supply
Sewerage
Counter Kitchen
Water Purifier
Hot Water Supply
Heated Toilet Seat With Bidet
Shampoo Dresser
Wood Flooring
Double-Glazed Windows
24-Hour Ventilation System
Storage Space
Underfloor Storage
Dimple Key
Intercom With Monitor
Fire Alarm Installed

Transit

Nearby Stations

Ohmi Railway Main Line
14 min walk

property.neighborhoodMap

View on Google Maps

Neighborhood

Nearby Schools

0.7 km
0.9 km
0.9 km

Area Information

Elementary School
N/A
Junior High School
N/A
Usage Zone
第1種中高層住居専用地域
City Planning Area
N/A
Area Classification
N/A
Location Optimization Plan
N/A
City Planning Road
N/A

Usage Zone

第1種中高層住居専用地域

Area Classification

Urbanization Promotion Area

Development is encouraged. Infrastructure like roads, water, and sewage is prioritized and well-maintained.

Location Optimization Plan

Residential Induction Zone

The city officially wants people to live here long-term. High likelihood of stable property values and nearby services.

Land Price History

YearPrice/SizeTotal Units
2025$37
Prices:
$36 / $26 / $53 / $33
4
2023$35
Prices:
$53 / $39 / $32 / $32 / $32 / $22
6
2022$32
Prices:
$39 / $32 / $32 / $32 / $22
5

property.details

Basic Info

Name滋賀県彦根市後三条町字宮立114番43(地番) 新築戸建
Building Name-
Address滋賀県彦根市後三条町字宮立114番43(地番)
Floor plan4LDK

Price

Price$157,439

Area

Land size124.47
Size97.6
私道負担-
セットバック-

Access

Transit
ひこね芹川 (16 Min Walk)
南彦根 (20 Min Walk)

Building

Year built-
Total floors2 Floor
Total basement floors-
Structure木造
Units for sale-

Land

Terrain平坦
Tenure所有権

Parking

Parking lot available-
Parking monthly fee-

City Plan

District第1種住居地域
City plan zone市街化区域
Building coverage ratio60 %
Floor area ratio181 %

Investment

For investmentNo
Gross yield-

Handover

Status空家
Detailed Status空家
引渡時期-

Nearby Properties You May Like

4-Bedroom House in Miyagawacho 0
$100,304
4-Bedroom House in Miyagawacho

Miyagawacho, Higashiomi, Shiga

2,110.6 ft²/4r
2005
House
近江八幡 Min Walk
3-Bedroom Condo Near Station in Yasukiyohigashimachi 0
$57,135
3-Bedroom Condo Near Station in Yasukiyohigashimachi

Yasukiyohigashimachi, Hikone, Shiga

728.6 ft²/3r
1996
Condo
Hikone Station 5 Min Walk
Well-Kept Property in Ogaya 0
ParkingPropane GasElectricity
$189,180
Well-Kept Property in Ogaya

Ogaya, Otsu, Shiga

1,621.4 ft²
1977
Other
Seta Station 15 Min Walk
Brand New 3-Bedroom House Near Station in Kiyosakicho 0
ParkingWalk-In ClosetAir Conditioner
$239,967
Brand New 3-Bedroom House Near Station in Kiyosakicho

Kiyosakicho, Hikone, Shiga

1,814.9 ft²/3r
2026
House
Kawase Station 6 Min Walk
Land in Jinryo 0
City GasElectricityWater Supply
$68,562
Land in Jinryo

Jinryo, Otsu, Shiga

1,380.8 ft²
Land
石山 Min Walk
Brand New 3-Bedroom House in Kiyosakicho 0
Bathroom DryerSystem KitchenWater Purifier
$189,180
Brand New 3-Bedroom House in Kiyosakicho

Kiyosakicho, Hikone, Shiga

2,272.6 ft²/3r
2026
House
彦根 Min Walk
6-Bedroom House with a Garden in Kiyosakicho 0
ParkingWalk-In ClosetRoof Balcony
$247,585
6-Bedroom House with a Garden in Kiyosakicho

Kiyosakicho, Hikone, Shiga

3,631.5 ft²/6r
1999
House
Hikoneguchi Station 18 Min Walk
Brand New 5-Bedroom House in Kokubu 0
$209,368
Brand New 5-Bedroom House in Kokubu

Kokubu, Otsu, Shiga

1,663.8 ft²/5r
2026
House
石山寺 23 Min Walk
Brand New 3-Bedroom House in Kiyosakicho 0
1 / 2 Units
Bathroom DryerSystem KitchenWater Purifier
$176,484
Brand New 3-Bedroom House in Kiyosakicho

Kiyosakicho, Hikone, Shiga

1,725.5 ft²/3r
2026
House
彦根 Min Walk
Brand New 3-Bedroom House in Ichiriyama 0
$215,716
Brand New 3-Bedroom House in Ichiriyama

Ichiriyama, Otsu, Shiga

874.1 ft²/3r
2026
House
Seta Station 13 Min Walk
Charming 4-Bedroom House in Sugoshicho 0
$31,742
Charming 4-Bedroom House in Sugoshicho

Sugoshicho, Hikone, Shiga

2,834.6 ft²/4r
1972
House
河瀬 59 Min Walk
Vintage 4-Bedroom House in Oiwakeminami 0
$182,832
Vintage 4-Bedroom House in Oiwakeminami

Oiwakeminami, Kusatsu, Shiga

1,873.8 ft²/4r
1989
House
草津 30 Min Walk
Charming 4-Bedroom Condo in Ogaya 0
$132,680
Charming 4-Bedroom Condo in Ogaya

Ogaya, Otsu, Shiga

871.7 ft²/4r
1985
Condo
Seta Station 8 Min Walk
Classic 2-Bedroom Condo in Wakabacho 0
Propane GasWater SupplySewerage
$8,062
Classic 2-Bedroom Condo in Wakabacho

Wakabacho, Omihachiman, Shiga

443.8 ft²/2r
1974
Condo
Ōmi-Hachiman Station 17 Min Walk
Land in Otowacho 0
$113,635
Land in Otowacho

Otowacho, Omihachiman, Shiga

2,238.8 ft²
Land
近江八幡 20 Min Walk
$31,615
Vintage 8-Bedroom House in Kitasudacho

Kitasudacho, Higashiomi, Shiga

3,658.3 ft²/8r
1980
House
能登川 33 Min Walk
Classic Property in Hasamata 0
$107,922
Classic Property in Hasamata

Hasamata, Maibara, Shiga

10,169.5 ft²
1972
Other
近江長岡 Min Walk
Vintage 10-Bedroom House in Shimokomazuki 0
1 / 2 Units
Propane GasWater SupplySeptic Tank
$17,775
Vintage 10-Bedroom House in Shimokomazuki

Shimokomazuki, Gamo Gun Hino Cho, Shiga

3,914.1 ft²/10r
1995
House
日野 57 Min Walk
Well-Kept 3-Bedroom House in Yabasecho 0
City GasElectricityWater Supply
$154,265
Well-Kept 3-Bedroom House in Yabasecho

Yabasecho, Kusatsu, Shiga

1,105 ft²/3r
1979
House
南草津 16 Min Walk
Brand New 4-Bedroom House with a Garden in Oboricho 0
ParkingBarrier-FreeBathroom Dryer
$254,568
Brand New 4-Bedroom House with a Garden in Oboricho

Oboricho, Hikone, Shiga

1,603 ft²/4r
2024
House
南彦根 27 Min Walk
Have Questions?
Request More Info?
Contact Agent
Toyo Tanuma
Toyo Tanuma
Open Room Inc.
Contact Agent