1 / 1

Classic Studio Condo Near Station in Yamawakicho

Yamawakicho, Nagoya Showa, Aichi•愛知県名古屋市昭和区山脇町3丁目14-2

Price

$22,189
Management Fee: $29 / Month
Repair Reserves: $32 / Month

Layout & Size

1 rooms / R / 180.2 ft²
Listed
8/23/2026
Property Type
Condo
Year Built
1987
Price/Size
$123.1
Gross Yield
estimating
Last Updated: August 23, 2026

Transit

Nearby Stations

property.neighborhoodMap

View on Google Maps

Neighborhood

Nearby Schools

Area Information

Elementary School
N/A
Junior High School
N/A
Usage Zone
N/A
City Planning Area
N/A
Area Classification
N/A
Location Optimization Plan
N/A
City Planning Road
N/A

Land Price History

YearPrice/SizeTotal Units

property.details

Basic Info

Nameメゾン・ド・セゾン
Building Nameメゾン・ド・セゾン
Address愛知県名古屋市昭和区山脇町3丁目14-2
Room number317
Floor plan1R
Sun exposure南

Price

Price$22,189
Management fee$29
Repair reserve fee$32
Other fee-

Area

Size16.74
バルコニー面積-
専用庭面積-

Access

Transit
荒畑 (5 Min Walk)

Building

Year builtDecember 1987
Floor-
Total floors4 Floor
Total basement floors-
Total units-
Total units in the building-
StructureRC造

Land

Tenure所有権

Parking

Parking lot available-
Parking monthly fee-

City Plan

District第2種中高層住居専用地域

Investment

For investmentYes
Gross yield-

Handover

Status入居中
Detailed Status賃貸中
引渡時期-

Nearby Properties You May Like

Charming Studio Condo in Motomiyacho 0
1 / 4 Units
Auto-LockBicycle ParkingShower
$12,362
Charming Studio Condo in Motomiyacho

Motomiyacho, Nagoya Showa, Aichi

177.3 ft²/1r
1989
Condo
Fukiage Station 13 Min Walk
2-Bedroom Condo in Oi 0
Auto-LockBicycle ParkingSystem Kitchen
$25,232
2-Bedroom Condo in Oi

Oi, Chita Gun Minamichita Cho, Aichi

793.8 ft²/2r
1996
Condo
河和 Min Walk
Vintage 4-Bedroom House in Yamakatacho 0
Propane GasElectricityWater Supply
$27,261
Vintage 4-Bedroom House in Yamakatacho

Yamakatacho, Tokoname, Aichi

1,984.3 ft²/4r
1977
House
りんくう常滑 37 Min Walk
Modern 2-Bedroom Property in Daigishincho 0
City GasHot Water SupplySeparate Bath And Toilet
$171,171
Modern 2-Bedroom Property in Daigishincho

Daigishincho, Nagoya Mizuho, Aichi

949.5 ft²/2r
2018
Other
Mizuho Undōjō Nishi Station 16 Min Walk
3-Bedroom House in Yokoicho 0
Walk-In ClosetSystem KitchenCity Gas
$167,938
3-Bedroom House in Yokoicho

Yokoicho, Nagoya Nakamura, Aichi

1,442.8 ft²/3r
2005
House
Fushiya Station 18 Min Walk
Charming 3-Bedroom Condo in Horinochicho 0
1 / 5 Units
Bicycle ParkingSeparate Bath And ToiletShower
$18,892
Charming 3-Bedroom Condo in Horinochicho

Horinochicho, Kasugai, Aichi

579.4 ft²/3r
1976
Condo
Jinryō Station 10 Min Walk
Classic Studio Property Near Station in Shoeicho 0
$588,321
Classic Studio Property Near Station in Shoeicho

Shoeicho, Kariya, Aichi

2,603.4 ft²/1r
1992
Other
Noda-Shimmachi Station 4 Min Walk
Charming Studio Condo Near Station in Heiwa 0
Auto-LockBicycle ParkingShower
$36,770
Charming Studio Condo Near Station in Heiwa

Heiwa, Nagoya Naka, Aichi

238 ft²/1r
1988
Condo
Higashi Betsuin Station 6 Min Walk
Charming Studio Condo Near Station in Nishikoikecho 0
1 / 2 Units
$10,777
Charming Studio Condo Near Station in Nishikoikecho

Nishikoikecho, Toyohashi, Aichi

210.2 ft²/1r
1990
Condo
小池 3 Min Walk
Well-Kept Studio Condo Near Station in Aoi 0
Bicycle ParkingShowerElevator
$12,679
Well-Kept Studio Condo Near Station in Aoi

Aoi, Nagoya Higashi, Aichi

213.6 ft²/1r
1974
Condo
Shinsakae-machi Station 3 Min Walk
Property in Saichicho 0
ParkingCity Gas
$360,093
Property in Saichicho

Saichicho, Iwakura, Aichi

3,606 ft²
2001
Other
Iwakura Station 11 Min Walk
Charming 1-Bedroom Condo in Nakashimadori 0
With Lighting Fixtures
$25,359
Charming 1-Bedroom Condo in Nakashimadori

Nakashimadori, Ichinomiya, Aichi

530.8 ft²/1r
1974
Condo
尾張一宮 33 Min Walk
Vintage 2-Bedroom House in Nishiimajuku 0
$22,062
Vintage 2-Bedroom House in Nishiimajuku

Nishiimajuku, Ama, Aichi

1,156.4 ft²/2r
1967
House
Jimokuji Station 18 Min Walk
Classic 3-Bedroom Condo Near Station in Koyo 0
$41,208
Classic 3-Bedroom Condo Near Station in Koyo

Koyo, Nagoya Minato, Aichi

595.8 ft²/3r
1987
Condo
Tsukiji-guchi Station 7 Min Walk
Classic Studio Condo in Meitohondori 0
Auto-LockBicycle ParkingAir Conditioner
$13,947
Classic Studio Condo in Meitohondori

Meitohondori, Nagoya Meito, Aichi

174.4 ft²/1r
1988
Condo
Hoshigaoka Station 13 Min Walk
Vintage Studio Condo in Motomiyacho 0
Bicycle ParkingShowerTiled Exterior
$16,800
Vintage Studio Condo in Motomiyacho

Motomiyacho, Nagoya Showa, Aichi

177.3 ft²/1r
1988
Condo
Fukiage Station 13 Min Walk
Vintage Studio Condo Near Station in Koyo 0
Bicycle ParkingShowerElevator
$15,849
Vintage Studio Condo Near Station in Koyo

Koyo, Nagoya Minato, Aichi

196.3 ft²/1r
1990
Condo
Tsukiji-guchi Station 5 Min Walk
Well-Kept Studio Condo Near Station in Sakae 0
1 / 2 Units
Bicycle ParkingShowerElevator
$18,385
Well-Kept Studio Condo Near Station in Sakae

Sakae, Nagoya Naka, Aichi

188.4 ft²/1r
1973
Condo
Fushimi Station 7 Min Walk
Property in Fujitsuka 0
City GasSeptic TankHot Water Supply
$779,779
Property in Fujitsuka

Fujitsuka, Nisshin, Aichi

11,822.1 ft²
2005
Other
日進 22 Min Walk
Classic Studio Condo in Sakae 0
Air ConditionerShowerElevator
$44,314
Classic Studio Condo in Sakae

Sakae, Nagoya Naka, Aichi

217.5 ft²/1r
1975
Condo
Fushimi Station 9 Min Walk
Have Questions?
Request More Info?
Contact Agent
Toyo Tanuma
Toyo Tanuma
Open Room Inc.
Contact Agent